kacdurak.com
Line status Checking Metro İstanbul notices…

How to get from Atatürk Havalimanı to Gebze

Checked: 14 October 2026
38stops
~107 minestimated time
2changes
  1. Atatürk HavalimanıStart
  2. DTM-İstanbul Fuar Merkezi~2 min
  3. YenibosnaChange to M9 metro · ~4 min M9MB
  4. AtaköyChange to Marmaray · ~10 min MR
  5. Bakırköy~17 min
  6. Yenimahalle~18 min
  7. Zeytinburnu~21 min
  8. Kazlıçeşme~23 min
  9. Yenikapı~28 min M1AM1BM2
  10. Sirkeci~31 min T1
  11. Üsküdar~36 min M5
  12. Ayrılık Çeşmesi~41 min M4
  13. Söğütlüçeşme~43 min MB
  14. Feneryolu~45 min
  15. Göztepe~47 min
  16. Erenköy~50 min
  17. Suadiye~52 min
  18. Bostancı~54 min M8
  19. Küçükyalı~56 min
  20. İdealtepe~58 min
  21. Süreyya Plajı~61 min
  22. Maltepe~62 min
  23. Cevizli~66 min
  24. Atalar~68 min
  25. Başak~70 min
  26. Kartal~72 min
  27. Yunus~75 min
  28. Pendik~78 min
  29. Kaynarca~81 min
  30. Tersane~84 min
  31. Güzelyalı~86 min
  32. Aydıntepe~88 min
  33. İçmeler~89 min
  34. Tuzla~93 min
  35. Çayırova~97 min
  36. Fatih~100 min
  37. Osmangazi~102 min
  38. Darıca~105 min
  39. GebzeArrive · ~107 min
Lines are drawn as straight segments between stops

About this route

There's no single line from Atatürk Havalimanı to Gebze. The quickest way: take the M1A metro train towards Yenikapı at Atatürk Havalimanı and get off after 2 stops at Yenibosna; then take the M9 metro train towards Ataköy at Yenibosna and get off at the next stop, Ataköy; then take the Marmaray train towards Gebze at Ataköy and get off after 35 stops at Gebze.

That's 38 stops and 2 changes in total. Time on board is about 99 minutes; with the changes, allow about 107 minutes.

A second option goes via M1A metro and Marmaray: 47 stops, 1 change, about 119 minutes.

Some of these times are calculated from distances, so they can be a few minutes off.

Step by step

  1. M1ATake the M1A metro train towards Yenikapı at Atatürk Havalimanı and get off after 2 stops at Yenibosna. 2 stops, about 4 min
  2. M9Take the M9 metro train towards Ataköy at Yenibosna and get off at the next stop, Ataköy. 1 stop, about 3 min
  3. MRTake the Marmaray train towards Gebze at Ataköy and get off after 35 stops at Gebze. 35 stops, about 93 min

Changing lines

  1. M1AM9Change 1: YenibosnaGet off the M1A metro at Yenibosna. In the same station, change to the M9 metro and board towards Ataköy. Allow about 4 minutes for the change. The M9 metro station has 4 lifts and 10 escalators.
  2. M9MRChange 2: AtaköyGet off the M9 metro at Ataköy. In the same station, change to the Marmaray and board towards Gebze. Allow about 4 minutes for the change.

Fares and holidays

Full fare
46,20 TL
Student
22,55 TL
Teacher / age 60+
33,08 TL
Age 65+
Free

With a full-fare İstanbulkart the trip comes to about 154,84 TL: M1A 46,20 TL (first boarding), M9 34,40 TL (first transfer), Marmaray 74,24 TL (35 stations).

Changing vehicles within 120 minutes of the first tap costs 34,40 TL for the first transfer, 26,42 TL for the second and 17,18 TL after that. There's no transfer discount when you get on the Metrobus.

On holidays İBB lines are often free (with an Istanbulkart registered to your ID); Marmaray and the M11 need a separate presidential decision. Public holidays

Fares in effect since 20 July 2026. All fares

Related routes

Frequently asked questions

Where do I change between Atatürk Havalimanı and Gebze?

At Yenibosna and Ataköy.

How many stops is it from Atatürk Havalimanı to Gebze?

38 stops with 2 changes, about 107 minutes.

Is there another way?

Yes: via M1A metro and Marmaray, 47 stops, 1 change, about 119 minutes.

When are the first and last M1A metro services?

The first M1A metro service leaves at 05:50 and the last at 00:00. These are the line's opening hours; the time it passes your stop can be a few minutes later.

How much does it cost from Atatürk Havalimanı to Gebze?

With a full-fare İstanbulkart the trip comes to about 154,84 TL: M1A 46,20 TL (first boarding), M9 34,40 TL (first transfer), Marmaray 74,24 TL (35 stations).

Looking for another route?

      Route data: Metro İstanbul, İBB Açık VeriChecked: 14 October 2026Sources and method